Me2, Fog Generator
Operating Guide, Rev: A/a 8 / 30
Installing the Me2
Exercise caution when selecting the location to install or use this equipment:
Install the MDG Me2 away from rain, wind, heavy dust or any harsh environment
situations.
Ensure available space for all electrical cable and gas tubing runs,
The MDG Me2 requires 2 m (6.56 ft) of clearance to the front.
Fill the reservoir with MDG Neutral Fog Fluid (see Filling the Fluid Reservoir paragraph).
Connect the gas inlet to a gas bottle equipped with a single or double stage regulator. The gas
inlet is an Oxygen Adaptor (9/16-18 R.H).
Connect the data wiring (Male XLR-5 connector for DMX/RDM) if you are using a DMX or RDM
controller.
Connect the power cord 100-250 VAC, 50-60 Hz, 1415W.
Open the gas bottle, and set the pressure between 50 and 60 psi (3.5 and 4.1 bar, or 350 and
410 kPa).