EasyManua.ls Logo

MDV MFS2i-24ARN1 - Test Run; Wiring

MDV MFS2i-24ARN1
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
5.5 Wiring
Please refer to the Wiring Diagram.
Note: The power supply of the air conditioner is different according to the models. Please
refer to the WIRING DIAGRAM pasted on the indoor and outdoor units before wire
connection.
5.6 TEST RUN
Perform test operation after completing gas leak and electrical safety check. The test
operation time should last more than 30 minutes.
1. Open the panel and lift the panel up to angle which remains fixed. Do not lift the panel
any further when it stops with a "click"sound.
2. Press the manual switch button twice until the operation indicator lights, the unit will
operate on Manual Cool mode.
3. Check if all the functions works well while testing the air conditioner. Especially check
whether the drainage of indoor unit is smooth or not.
4. Press the manual switch button again till the operation indicator turns dark after
finishing the test operation and the unit stops operation.