EasyManua.ls Logo

Mercury 200 Optimax - Steering Cable - Starboard Side Routed Cable

Mercury 200 Optimax
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OUTBOARD INSTALLATION
90
2. Thread the lifting eye into the flywheel hub for a minimum of
five turns.
a
28495
a - Lifting eye
3. Connect a hoist to the lifting eye.
4. Lift the outboard and place it on the boat transom.
Lifting Eye 91‑90455‑‑1
2756
Threads into the flywheel to
remove the powerhead assembly
from the driveshaft housing, or to
lift entire engine for removal/
installation.
Steering Cable ‑ Starboard Side Routed Cable
1. Lubricate O‑ring seal and entire cable end.
3724
95
Tube Ref No. Description Where Used Part No.
95
2-4-C Marine
Lubricant with Teflon
O-ring seal and entire
cable end
92-802859A1

Table of Contents

Other manuals for Mercury 200 Optimax

Related product manuals