CHARGING & STARTING SYSTEM
90-883728 JULY 2001 Page 2B-37
STARTER SOLENOID TEST
1. Disconnect all wires from solenoid.
2. Use an ohmmeter (R x1 scale) and connect meter leads between solenoid terminals
1 and 2.
3. Connect a 12-volt power supply between solenoid terminals 3 and 4. Solenoid should
click and meter should read 0 ohms (full continuity).
4. If meter does not read 0 ohms (full continuity), replace solenoid.
51809
b
1
3
a
b
2
4
a
a-12 Volt Supply
b-VOA Leads