19
Installation Guide
Instructions for Installation & First Time Start-up
The facility will need to provide the appropriate grounded electrical outlet, hot and cold-
water supply lines with shut off valves and standard 3/4” male garden hose fittings for each
supply or the hoses that are supplied with the system. (USING ½” FULL PORT BALL VALVES
AND ½” ID HOSES IS PERFERRED FOR ADEQUATE WATER SUPPLY) A drain connection of
1.5” diameter minimum (see system specification of this manual for further assistance).
Connect the facility drain to the system drain with “P” trap.
Connect the facility hot and cold lines to the system hot and cold inlets.
Connect the solution container (see changing solutions containers section of this manual).
Apply water pressure by opening the facility supplied inlet valves and check for leaks.
Perform several hand wash cycles by blocking the photo optical sensor in the cylinder.
Allow enough time for the hot water supply to reach the system.
Check for leaks and the system is ready to use.
THE UNIT IS NOW READY FOR NORMAL HAND WASH OPERATION