Safety Precautions
© 2010 Meru Networks, Inc. Installing OAP180 87
Chapter 6
Installing OAP180
This chapter describes how to physically install an OAP180. It contains the following
sections:
Safety Precautions
Unpacking the OAP180
Installation Requirements
Installing the Access Points
Where to Go From Here
Checking LED Activity
Safety Precautions
IMPORTANT—Read and follow the instructions in Appendix , “Regulatory Information”
on page 109 before installing and operating this product.
This product is intended to be powered by a UL Listed power supply, marked Class 2
or LPS, and rated minimum 5 Vdc, 3A.
If the installation requires a different supply than the one supplied, make sure you
use a supply displaying the mark of the safety agency that defines the regulations of
the supply in your country.
Caution!
The OAP180 is not certified for plenum installations, and should not be
installed in the plenum space.