10
OPERATING MANUAL
3.3 Checking e Power Supply
METALMASTER machines are supplied wired ready to run. Check the specication plate on the
machine to conrm the correct voltage of the power supply.
e machine must be connected to the power by a qualied and licensed electrician. Warranty
could be voided if it is found that the connection was not carried out by a qualied electrician.
Start the pump by turning the key selector to the right.
Compare the direction of rotation of the motor. e blades need to rotate clockwise
If the direction does not match, stop the pump rotation by turning the key and make changes to
the wiring
3.2 Machine Leveling
To set your machine up so that it operates to optimum performance, apply the following procedure
Aer your panbrake has be anchored to a concrete slab oor, it then needs to be leveled. e level-
ing is performed using each of the screws on each pad.(Fig. 3.1). Loosen the hold down bolts and
place a level on the surface of the working table. Tolerances: 1000:0.30mm, for both axis.
Metal plates need to be placed under each jacking screw to distribute the load. Once level then
tighten the hold down bolts.
Metal Plate
Jacking Screw
e machine must not rest on supports other
than those dened in Fig. 3.1
Fig. 3.1