FlowPrep 060 Sample Preparation
Nov 2010 3-13
Degassing Samples
1. Place the degasser power switch in the ON ( | ) position.
2. Set the temperature controller to the desired temperature.
3. Place the flow control valve on the desired heating station in the open position.
4. Wipe the gas delivery tube with a clean cloth to remove any residue left from the previous
sample.
When the FlowPrep leaves the factory, stabilizing tubes are placed in heating stations
1 and 6 to prevent the heater block from shifting during shipment. Be sure to remove
these tubes before turning on the FlowPrep.
Heat is delivered to all six heating stations; therefore, to prevent burns keep your
hands away from the interior of the heating stations.