■ Carry the unit onto the site
1) In order to avoid scratch or deformation of the unit surface, apply guard boards to the contacting
surface.
2) No contact of fingers and other things with the vanes.
3) Don’t incline the unit more than 45° in moving, and keep it vertical when installing.
■ Install the unit.
1) The circulating air for every unit should be more than 2400m3/h.
2) Make sure there is enough Installation space.e
3) Outline dimensional drawing
Water treatment
In order to use our appliances under the best conditions, the following parameters must be respected:
free chlorine:max. 2.5mg/l, total bromine: max. 5.5 mg/l, PH between 6.9 and 8.0. If chemical or
electrophysical disinfection systems are used, the installer and user must contact the supplier to ensure they
are compatible with our materials. These systems must be installed after the heating system.