1. Confirmation Before the Trial Operation
1.1 All the installation is complete.
1.2 Water heater is installed correctly.
1.3 The pipelines and wiring are correct.
1.4 The accessories are installed correctly.
1.5 The drainage is smooth.
1.6 The thermal insulation is sound.
1.7 The earthing wire is connected correctly.
1.8 The power voltage is consistent with the rated voltage of the heater.
1.9 No obstacle at the air inlet and outlet of the unit.
1.10 The leakage protector can work effectively.
2. Operating Instruction
2.1 The appearance of controller
2.2 Name and function description of LCD screen of wire controller

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Midea LRSJ-60/NYN1 and is the answer not in the manual?

Midea LRSJ-60/NYN1 Specifications

General IconGeneral
BrandMidea
ModelLRSJ-60/NYN1
CategoryWater Heater
LanguageEnglish

Related product manuals