Midea MV8M-120WV2RN1 - User Manual

Midea MV8M-120WV2RN1
111 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
MV8M-120WV2RN1
MV8M-140WV2RN1
MV8M-160WV2RN1
Engineering Data
Commercial Air Conditioners
R410A
380-415V 3N 50Hz
Series VRF
Question and Answer IconNeed help?

Do you have a question about the Midea MV8M-120WV2RN1 and is the answer not in the manual?

Midea MV8M-120WV2RN1 Specifications

General IconGeneral
BrandMidea
ModelMV8M-120WV2RN1
CategoryAir Conditioner
LanguageEnglish

Summary

Part 1 General Information

1 Indoor and Outdoor Unit Capacities

Details the capacity ranges for various indoor and outdoor unit types.

3 Nomenclature

Explains the coding system for identifying indoor and outdoor units.

5 Selection Procedure

Outlines the systematic process for selecting appropriate system components.

Part 2 Outdoor Unit Engineering Data

1 Specifications

Provides detailed technical specifications for the outdoor units.

3 Installation Space Requirements

Specifies the necessary clearances for proper outdoor unit installation.

6 Electrical Characteristics

Details the electrical power requirements and ratings for the outdoor units.

8 Capacity Tables

Presents comprehensive tables showing cooling and heating capacities under various conditions.

9 Operating Limits

Defines the operational temperature and humidity ranges for the units.

10 Sound Levels

Reports the sound pressure and power levels for the outdoor units.

Part 3 System Design and Installation

2 Unit Placement and Installation

Covers guidelines for correctly positioning and installing outdoor and indoor units.

3 Refrigerant Piping Design

Details the principles and specifications for designing the refrigerant piping system.

4 Refrigerant Piping Installation

Explains the procedures and principles for installing refrigerant piping correctly.

5 Drain Piping

Provides guidance on designing and installing the condensate drain piping system.

7 Charging Refrigerant

Outlines the procedure for calculating and adding the correct refrigerant charge.

8 Electrical Wiring

Covers the requirements for power supply and communication wiring installation.

10 Commissioning

Details the pre-commissioning checks and test run procedures for system verification.