EasyManua.ls Logo

Midea VLS Series - Installation Order

Midea VLS Series
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Mount the unit upright without inclination according to the dimension show in the
following illustration
Installation order
The operation of the installation can only be carried out by author-
ized professionals.
Please pay attention to the special requirements for installation
made by the local country.
Please pay attention to the related regulations on the bonding
pressure of gas and gas types on the nameplate of the heater.
Before connecting the gas pipe and water pipe to the heater,please
pay attention to the cleanout of these pipes to remove impurities
and other pollutants.
Shower nozzle
Water outlet valve
Water outlet valve
Water outlet pipe
Water inlet valve
Water inlet pipe
Water
source
Exhaust pipe
Power
supply plug
Water heater
Gas inlet pipe
(2m)
FrontMore than 600mm
TOP: More than 300mm
More than 150mm More than 150mm

Related product manuals