EasyManua.ls Logo

Mikuni MY16 User Manual

Default Icon
13 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation of the heater
.
The Mikuni MY series heaters are blown air diesel fired heaters running off either a
12
or
24
volt DC supply
.
To ensure good service from your heater it is important to install it correctly
paying attention to all the details laid out
within this instruction leaflet
.
Planning the Installation
Take time to plan your installation
!
The heater should be sited in an area where
:
(i
)
It will not have items stored against it.
(
ii
)
It will not be exposed to weather
.
(
iii
)
It is within the parameters set out in this manual regarding fuel and power supply.
(
iv
)
It is within the parameters set out in this manual regarding heater mounting
.
(v
)
The exhaust outlet skin fitting is well clear of the water line.
(
vi
)
The exhaust pipe is not touching anything inside the boat which could be damaged by
heat
-The exhaust pipe does get hot even though it is insulated!
Tools for your installation
:
Here is a list of some of the tools required to help with your installation
:
1.
Electric drill with slow speed
.
2.
Crimping pliers
.
3.
Wire cutters
.
4.
Metric spanners
8
mm to
13
mm
.
5.
Flat blade
& posidrive screwdrivers.
6
.
Sharp knife
.
Application
Hot air outlets
Ducting
Skin fitting
Fuel standpipe
MY
16
95
mm
60
mm
42
mm
22
mm
MY
30
95
mm
90
mm
42
mm
22
mm
Hole saws
-
1
-
Question and Answer IconNeed help?

Do you have a question about the Mikuni MY16 and is the answer not in the manual?

Mikuni MY16 Specifications

General IconGeneral
BrandMikuni
ModelMY16
CategoryHeater
LanguageEnglish

Summary

Installation of the heater

Planning the Installation

Plan the location and siting of the heater to ensure safe and optimal operation.

Tools for your installation

List of essential tools required for the installation process.

Mounting the heater

Exhaust and combustion air system

Details on fitting the exhaust skin fitting and managing combustion air.

Fuel system

Installation of copper fuel line

Step-by-step guide for installing the fuel line and pump.

Electrical

MY16 Wiring

Wiring loom connections and thermostat mounting for the MY16 model.

MY30 Wiring

Wiring loom connections and control box mounting for the MY30 model.

Air distribution

Air inlet details

Information on how to route the air inlet for the heater.

Trial Operation

Final check

Checklist to confirm all installation steps are completed correctly before operation.

Trial operation procedure

Steps to follow for initial startup, fuel priming, and testing the heater.

MY16 Self Diagnostic Fault Finding System

MY16 FAULT FINDING SEQUENCE

Step-by-step flowchart to diagnose and resolve faults in the MY16 heater.

MIKUNI MY30 FAULT FINDING SEQUENCE

MIKUNI MY30 FAULT FINDING SEQUENCE

Flowchart to diagnose and resolve faults in the MY30 heater.

Related product manuals