EasyManua.ls Logo

Milli-Q ZR0Q00800 User Manual

Default Icon
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
User Manual
Milli-Q® Direct 8/16 System
Question and Answer IconNeed help?

Do you have a question about the Milli-Q ZR0Q00800 and is the answer not in the manual?

Milli-Q ZR0Q00800 Specifications

General IconGeneral
ModelZR0Q00800
Resistivity18.2 MΩ·cm at 25 °C
TOC< 5 ppb
Pyrogens (Endotoxins)< 0.001 EU/mL
RNases< 1 pg/mL
Flow RateUp to 2 L/min
Feed Water TypeTap Water
Output Water QualityUltrapure water
Particles > 0.22 μm< 1 particle/mL
Bacteria< 1 CFU/mL
Power Supply100-240 V AC, 50-60 Hz

Summary

Introduction

About this User Manual

Details the purpose, terminology, and document identification for the user manual.

About Millipore SAS

Provides contact information and manufacturing site details for Millipore SAS.

Legal Information

Covers notice, product warranty, trademarks, copyright, and recycling guidelines.

Safety Information

Covers general safety statements, symbols, and important operational guidelines.

Product Information

Overview

Introduces topics related to the system, including requirements and components.

Cabinet

Details the main unit of the system and its components.

Reservoir

Describes the recommended reservoirs for the system.

Consumables

Lists and describes the various consumables used by the system.

Specifications and requirements

Outlines the technical specifications and operational requirements for the system.

Installation

Overview

Explains the purpose of the chapter and lists installation topics with page numbers.

Summary list

Provides a step-by-step summary of the system installation process.

Alarms generated during installation

Explains common alarm messages generated during system installation.

Assembling the POD Unit

Instructions for separating and placing the POD Arm onto the POD Mast.

Tubing, cables and power cord

Lists and describes the system's tubing, cables, and power cord connections.

Installing the Progard® Cartridge

Step-by-step instructions for installing a new Progard® Cartridge.

Installing the Q-Pak® Pack

Step-by-step instructions for installing a new Q-Pak® Pack.

Rinsing the RO Cartridges

Explains the importance and procedure for flushing and rinsing RO cartridges.

Rinsing the Q-Pak® Pack

Step-by-step instructions for rinsing the Q-Pak® Pack.

Installing a POD Pak

Outlines steps for installing and registering a POD Pak.

Registering UV Lamp timers

Explains the need to reset UV lamp timers and provides the procedure.

Registering PERFORM RO CL2 CLEANING message timer

Procedure to reset the timer for the PERFORM RO CL2 CLEANING message.

Registering EXAMINE INLET STRAINER message timer

Procedure to reset the timer for the EXAMINE INLET STRAINER message.

Calibrating the Flow rate

Explains that flow rate calibration is needed upon system installation.

Performing a TOC Curve Check

Explains how to perform a TOC Curve Check to ensure valid TOC values.

Software

Overview

Introduces the chapter explaining the various software used in the system.

Software Map

Visual representation of the system's software structure and navigation.

Standby Mode

Explains the primary uses of the STANDBY mode and its interface.

Manager Menu

Introduces the Manager Menu, how to enter it, and its functions.

Ready Mode

Explains water dispensing and viewing parameters in READY mode.

Using the Milli-Q® Direct System

Overview

Introduces the chapter on dispensing water and viewing system information.

Dispensing water

Provides instructions on dispensing water using the POD Unit plunger.

Viewing water quality

Step-by-step instructions for viewing the water quality parameters.

Viewing Operation

Explains how to view system operation, alerts, alarms, and measures.

Viewing Consumable Status

Details how to view information related to the status of consumables.

Calling Millipore SAS

Explains how to access contact information for Millipore SAS representatives.

Viewing Information

Explains how to view flow schematic, version, and system information.

Maintenance

Overview

Introduces the chapter on common maintenance procedures for the system.

Maintenance Schedule

Details maintenance needed for consumables, UV lamps, cleaning, and calibration.

Replacing the Progard® Cartridge and Vent Filter

Specifies when to replace the Progard® Cartridge and Vent Filter.

Replacing the Q-Pak® Pack

Specifies when to replace the Q-Pak® Pack and provides removal/installation steps.

Replacing a POD Pak

Discusses POD Pak replacement based on flow rate, messages, and provides registration steps.

TOC Curve Check

Specifies when a TOC Curve Check should be performed and provides the procedure.

Sanitising the RO Cartridge(s)

Specifies when RO cartridge sanitisation is required and provides the procedure.

Cleaning the RO Cartridge(s)

Specifies when cleaning the RO cartridge may be required and provides the procedure.

Cleaning the Inlet Strainer

Explains the purpose and procedure for cleaning the inlet strainer.

Calibrating the Flow rate

Specifies when the flow rate should be calibrated.

Alarms

Overview

Introduces the chapter on alarm messages and how to manage them.

Alarm Information

Defines alarms, explains display, types, and how to cancel them.

Summary of Alarm messages

Lists alarm messages that stop the system and explains their meanings.

Alerts

Overview

Introduces the chapter on alert messages and how to manage them.

Alert information

Explains alerts, their types, examples, and how they appear on the display.

Summary of Alert messages

Lists various alert messages and their corresponding meanings and actions.

Ordering Information

Consumables, Accessories and Systems

Lists catalogue numbers for Milli-Q Direct systems, consumables, and accessories.

Related product manuals