EasyManua.ls Logo

Minebea CSD-903-EX - Page 114

Minebea CSD-903-EX
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98
10-15. Setting for the operation of compensation flow
Set for the operation of compensation flow.
10-15-1. Maximum time of compensation flow
Set the maximum time of compensation flow by SQ function SQF-35.
Setting range: 000-255, Unit: 1time, 000:OFF
Default is set to [000].
10-15-2. Judge condition after compensation flow
Judge condition after compensation flow can be selected by SQ function SQF-36.
Judge condition after compensation flow can be selected from [Timer is up], [Stable and timer is up] or
[Stable or timer is up].
Default is set to [Timer is up].
10-15-3. Compensation flow time
The compensation flow time is set by SQ function SQF-37.
The compensation flow time can be set for each brand number by setting SQF-24: Flow/Discharge
brand setting target.
Setting range: 0000 to 9999, Unit: 0.01s, 0000: Compensation flow OFF
Default is set to [0000].
10-15-4. Waiting time for judge after compensation flow
The waiting time for judge after compensation flow is set by SQ function SQF-38.
The waiting time for judge after compensation flow can be set for each brand number by setting
SQF-24: Flow/Discharge brand setting target.
Setting range: 0000 to 9999, Unit: 0.01s, 0000: Compensation flow OFF
Default is set to [0000].
10-16. Setting for the operation of measuring finish output
Set for the operation of measuring finish output
10-16-1. Output time for the Batch finish signal
Set the output time for the Batch finish signal by SQ function SQF-40.
Setting range: 0000-9999, Unit: 0.01s, 0000: OFF
Default is set to [0000].

Related product manuals