16
Assembly of the RSL
After closing flap !"# neatly tuck the excess lanyard
under the reserve riser$ [Fig$ "]
Attach the snap shackle to the main riser RSL ring and
inspect routing$ The RSL shackle must not interfere
with the operation of the %&Ring System$ [Fig$ ']
Insert excess RSL lanyard fold into the space behind
the ring cover below the left main harness ring$ [Fig$ %]
Fig$ %
Fig$ '
Fig$ (
Fig$ "
MIRAGE SYSTEMS
Prior to closing flap !"# thread reserve ripcord through
the RSL rings with the ring on the RSL lanyard
between the housing keeper and the RSL retainer ring$
[Fig$(]#
IMPORTANT:
Proper configuration of the reserve
ripcord through the RSL rings is critical to the proper
function of the RSL system!