20
Bring the white loop over the small ring only and then
through the riser grommet so it pokes out the back of
the riser! [Fig! "]
IMPORTANT
: For the proper leverage reduction# the
white loop must only travel over the smallest ring! If
the loop passes through the middle ring also# the sys$
tem may fail!
Continue threading the white loop through the end fit$
ting on the cable housing! The flat side of the end fit$
ting should be against the riser! [Fig! %]
Thread the yellow cable through the white loop# making
sure the loop isn’t twisted! Be careful with the cable so
you don’t bend it too sharply or kink it! Insert the free
end in the channel on the back of the riser! There should
be plenty of excess cable with the cutaway handle
securely mated to the harness! [Fig!&]
Repeat the above steps with the other riser!
Fig! &
Fig! "
Fig! %
Assembly of the 3-Ring Release System
MIRAGE SYSTEMS