EasyManua.ls Logo

Mitsubishi City Multi PURY-P400 - LEV Replacement Procedure; Solenoid Valve Coil Replacement

Mitsubishi City Multi PURY-P400
145 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
102
(5) LEV
Be careful on removing heavy parts.
Procedure Photos
1. Remove the service panel. See (1)-1.2.3
2. Replace the applicable LEV.
Important!
1 When performing the above procedure, be sure to
allow for enough service space in the ceiling area
for welding.
2 If necessary, the unit can be lowered from the ceil-
ing before starting work.
(6) Solenoid Valve Coil
Procedure Photos
1. Remove the service panel. See (1)-1.2.3
2. Disconnect the connector of the applicable
solenoid valve.
3. Remove the solenoid valve coil.
1 SVA, SVB, and SVM1, 2 solenoid valve coils
can be serviced from the maintenance port.
If service space is available. SVC can be
serviced from the back.
Solenoid valve
LEV3
LEV1

Related product manuals