9.2 Maintenance of Charge Data
It is possible to change or correct the proportional division parameter, which is the proportionally divided
value data of the unit, or the apportioned electric power and electric power amount of WHM every day.
9.2.1 Preparing for Charging Data Maintenance
Prepare and perform the following for charging data maintenance:
(1) Maintenance object and date check
Check the object indoor unit and date whose proportional division parameter or apportioned electric
power, etc. you want to correct due to a failure.
Check by referring to the failure recovery data and charging data display color (normal, abnormal,
maintenance), system configuration, etc.
(2) Reference data preparation
Prepare the normal apportioning data and indoor unit FAN operation amount, capacity save ratio,
and other data.
* The FAN operation amount, capacity save ratio, and indoor unit operation performance, FAN
capacity, subsidiary heater capacity can be displayed on “Maintenance of charge data ” screen.
(3) Correction charge data study
Study the maintenance object indoor unit, interval (date) and charging data correction value from (1)
and (2) above.
At the end of the preparations above, perform charging data maintenance.
9.2.2 Maintenance Methods and Restrictions
Follow these steps to display the Charge Data Mainte-
nance screen.
Display the Maintenance screen.
[Procedure]
1) Click [Maintenance of charge data] button.
From the Initial window, click the [Maintenance of
charge data] button in the Maintenance group. The
Charge Data Maintenance screen appears.
Unit Data Maintenance
See sec. 9.2.3
Watt hour Meter Data Maintenance
See sec. 9.2.4
Test Operation Monitor of Watt Hour Meter
See sec. 9.2.5
Note:
•