Light Off Activities
1) Fill the heating system Check all piping and gas connections, verify they are all tight
Pressurize System (12-15 PSI) _____PSI
Add Water to prime condensate system
What percentage of propylene glycol is installed in the system (0-50%) ____%
Verify near heater piping and flue are properly supported
2) Check Gas Pipe Leak test using locally approved methods (consult jurisdictional code book)
Check incoming gas pressure (3.5" to 14" W.C.) ____in w.c. Static
What is the "drop" on light off (No more than 1" W.C.) ____in w.c. Dynamic
3) Record Ionization Current Check μA reading at d7 on the status menu (see start-up section) ____ μA High Fire ____ μA Low Fire
4) Verify System Operation Turn up thermostat to verify wiring connections
5) Check Combustion Check and adjust (if necessary) carbon dioxide content ____% CO2 High Fire ____%CO2 Low Fire
Check and adjust (if necessary) carbon monoxide content ____ppm CO High Fire ____ppm CO Low Fire
6) Record System Settings Record heating curve, record steps ____*8 ____*9 ____*10 ____*11
7) Indirect water heater Verify safety and operation of the Super-Stor Indirect water heater, record setttings ____de ____dh
Notes:
Date completed _______________