EasyManua.ls Logo

Monaco C-99A - Page 19

Default Icon
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION TWO
INSTALLATION
2.1
UNPACKING
AND
INSPECTION
Your Control Panel was carefully checked and packaged at the factory and
should be ready for installation and operation when it is unpacked. If the
shipping carton shows evidence of rough handling, inspect the contents
carefully for shipping damage. If damage is found notify the carrier
immediately. Verify that all parts ordered have been received. Check the
parts against the packing list and your Purchase Order. Part lists are
provided in Section
5.
2.2
WARNINGS
2.2.1
Personnel Safeguards
The following general
safety precautions must be observed during all phases
of operation, service, and repair of this equipment. Failure to comply
with these precautions or with specific warnings elsewhere in this manual
violates safety standards of design, manufacture, and intended use of the
equipment. Monaco assumes no liability for the Customers' failure to
comply with these requirements.
A.
Proper Ground
The equipment must be connected to an electrical ground to minimize the
shock hazard.
B.
Explosive Atmosphere
Do not operate the equipment in the presence of flammable gases, fumes or
dust
.
555
N
DOCUMENT NO.
001-097-00
PAGE
2-1
Monaco Ente~p~ises
IMG.
SPOKANE WASHINGTON
99214