QUICK START GUIDE
Of�ice Pro 60 & Of�ice Pro 63
• Moving the unit:
1 2
3
.
4
NEXT PAGE
Refer to the operaon manual and pay aenon to all the warnings and cauons throughout the manual
Typical Installaon Opons
NOTE: Ensure that the warm air moves away from the ceiling and the heat is dissipated.
If your applicaon does not meet this requirement, then extend the duct to the nearest
exhaust point based on the Maximum Equivalent Length listed in the operaon manual.
NOTE: Refer to the operaon manual for details on choosing the installaon site
A) Roll the unit into the space that needs cooling
Unlock the casters and push the MovinCool unit using the handle to a flat, level
surface and set the casters back to the LOCKED posion.
B) OPTION 1 set up steps
• Warm air flexible duct aachment to the unit:
1) Place the duct over the flange on the top of the unit as shown in the figure below.
1) Slide one end of the flexible duct to the ceiling le flange as shown in the figure
below.
2) Secure the flexible duct to the ceiling le flange with the clamp included with the
ceiling le.
2) Secure the duct to the flange with clamp included with the ceiling le (with 16” hole).
• Removal of original ceiling le:
Remove the original selected ceiling le from the ceiling (if the le is 2’ x 4’, then cut
the le into 2’ x 2’ and place one piece back into the ceiling at the end).
• Installaon of the ceiling le with the duct:
Place the ceiling le (with the duct) inside the ceiling.
C) OPTION 2 set up steps
• Condenser Air Plenum Installaon:
GX484410-8940
Flexible Duct
Kit
LAY45820-0010
LAY84270-0060
1
Handle
Unlocked
Locked
• Warm air flexible duct aachment to the ceiling le:
1) Open the condenser door, remove the filter
and set it aside.
2) Remove the six (6) screws that aach the
filter door hinge to the condenser side panel.
Remove the door hinges from the unit (save the
screws and the filter for later use).
3) Install the filter from the condenser side panel onto
the condenser plenum.
4) Insert boom flange of the condenser plenum
between side panel and three inner tabs.
5) Snap upper tabs of the plenum into place on
the side panel.
6) Use the screws provided in the kit to secure the
Air Plenum to the unit.
NEXT PAGE
Flexible Duct
Kit (16” Dia)
2
CONDITION TO USE OPTION 2
CONDITION TO USE
OPTION 1
and the temperature of the infiltrated
air is below the room temperature.
No negave air pressure** in the room
Between
65 °F (18 °C) to 105 °F (41 °C)
Opera ng temperature Range:
Negave air pressure** in the room.
Opera ng temperature Range:
Between
65 °F (18 °C) to 105 °F (41 °C)
**
-
MovinCool unit is installed and runs using OPTION 1.
-
Door to the room is closed.
-
No other source of air entering the room.
Ceiling Tile
(with 16” hole)