C.
PRE-OPERATION
CHECK LIST
1.
Water
Leaks
Open
the
valve
and run
water through
unit
to see
that
water runs properly
through
heat
exchanger.
No
water should
be
leaking from
it, or any
fittings.
2.
Fuel
Leaks
Make
sure
that
there
is no
fuel leaking from fuel tank, filters,
valves
or
from
any of the
piping
connections.
3.
Location
Make sure proper clearances
are
kept
around
unit
and
there
is
nothing
flammable nearby.
Keep
a
distance
from
walls
of
combustible material.
From
left
side
7 in
(180
mm)
From
right
side
19 in
(505
mm)
From back
of
heater
8 in
(205
mm)
From
Heater
to
closet door
29 in
(735
mm)
Flue
pipe
to
combustible surface, vertically
9 in
(229
mm)
Flue
pipe
to
combustible
surface,
horizontally
9 in
(229
mm)
4.
Flue
Connection
All
flue connections
must
be air
tight
and
sealed
so
that
no
fumes
can
leak
into
the
room.
5.
Unit
Wiring
The
power supply
is
properly
connected
and
grounded
to
unit.
D.
START
UP AND
OPERATION
1.
Readying
Safety
Device
For
Action
Press
and
turn
off
"Power" switch.
The
"Power"
light
goes
off.
Press
"Power"
switch
again, thus
turning
it on.
This procedure readies safety devices
for
action when necessary.
2.
Starting
Unit
With
the
"Power"
switch
in the
"ON"
position,
"Power"
lamp
should
be on.
Open
hot
water faucet
and
unit
will
ignite automatically.
(While
burner
has
flames,
run
lamp stays
on.)
Should
run
light
go
off,
a
code
"4" may
blink
signaling
air in
fuel
supply
line.
Refer
to
installation Manual "Test Run"
-6-