6 Checklist
Maschinenfabrik Reinhausen 201320 2349487/01 ENTAPGUARD® 260
Checklist
Observe the following checklist to perform commissioning:
No
.
Description Com-
plete
1 Connect and check temperature sensors
2 Connect tap-change supervisory control
3 Connect and check load current measurement
4 Wire status relay
5 Set COM1 baud rate
6 Set date and time
7 Set language
8 Set communication interfaces (optional)
9 Restart device
10 Activate commissioning mode
11 Perform test operation
12 Check event LED
Table 5: Checklist