3103-1001 Rev. 0 2
MultiGard
®
5000 System Instruction Manual Outline
1. General Information
1.1 Introduction
1.2 General Operating Specifications
1.3 Terminology
2. Installation
2.1 Receiving
2.2 Unpacking
2.3 Instrument Location Guidelines
2.4 Wiring
2.5 Plumbing
2.5.1 Sample Line Leak Checking
3. System Start-up / Set-up
3.1 Power-Up Sequence
3.2 Sensor/Analyzer Flow Adjustment, Flow Switch Adjustment
3.3 Sample Transport Time
3.4 Dwell Time Parameters
3.5 Actual Dwell Time
3.6 Auto Standardize Mode
4. Operator Interface
4.1 Operational Screens- Open Access
4.1.1 Overview
4.1.2 Gas Levels (and Alarming Status)
4.1.3 Flow Status (Sample and Bypass)
4.1.4 Auto Standardization
4.1.5 Manual Calibration
4.1.6 Sequencer Control (and Point Bypass Status)
4.1.7 Actual Point Pattern
4.1.8 About MultiGard 5000 System and Security Check
4.2 System Set-up Screens- Secure Access
4.2.1 Numerical Data Entry Screen
4.2.2 System Set-up Menu
4.2.3 Set points
4.2.4 User Configured Outputs (UCO) Option
4.2.5 UCO Enables
4.2.6 Extended Set-Up and Sample Transport Times
4.2.7 Sequencer Point Bypass
4.2.8 Sequencer Point Order
4.2.9 Diagnostics
4.2.10 SD Card Access, Password Change and Clock Set