EasyManua.ls Logo

muli ST+PX - Page 63

Default Icon
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
124
125
5. Finally, tension the rain cover at the
front using the tensioning rope and the
hooks on the front structure of the
muli and on the eyelets provided on
the rain cover.
Assembly Instruction
1. Loosen the quick release of the
handlebar and bring the handlebar to
the highest position. Fix again with the
quick release.
2. Assemble the frame linkage. Insert
the large rod into the two front frame
holders and the small rod into the two
rear holders.
3. Pull the rain cover from the front (!)
over the frame linkage and make sure
that it is already correctly positioned
at the front. Only then can it be pulled
over the basket plugs at the rear with
slight force.
4. Then tension the rain cover on the
handlebar side with the tensioning rope
and the hooks on the down tube of the
muli and on the eyelets provided on
the rain cover.
First hang the long tensioning rope on
one eyelet and guide it under the down
tube to the second eyelet.
Rain Cover