2. Installation
1. Remove eddi+ from packaging.
2. Place device on a at surface, loosen the pozi-head captive screw (1)
and lift cover off in a tilting motion.
3. Loosen the two mounting bracket screws (2) and separate the bracket
from the eddi+.
4. Place the bracket against the wall of the chosen location and mark
the holes ready for drilling and xing.
Suitable xings must be used dependant on application/mounting
surface. To be determined by the installer.
5. Pierce holes in grommets and pass all cables through and terminate
to the corresponding terminals relative to the installation.
WARNINGWARNING
ELECTRIC SHOCK - An electric shock can be fatal; electrical connection work
shall only be carried out by a competent person.
Supply
Supply cable shall meet the requirements of the local wiring regulations.
Strip 8mm insulation from conductors and insert into the terminals.
The eddi+ should be connected to a 3-phase 230/400V AC 50Hz supply.
Loads
Only purely resistive loads shall be used with eddi+.
The following criteria shall be observed:
Maximum rating of load: 3kW per phase
Minimum load rating: 150W
The load’s neutral conductor shall be connected to the load output N
terminal
No electronic controls shall be connected to the load terminals;
mechanical thermostats only
No timers shall be connected to the load terminals, including mechanical
timers
Ethernet
If applicable, ensure Ethernet is inserted into the RJ45 port.
1. Introduction
eddi+ is a 3-phase energy regulator, with manual/automatic action for use
with microgeneration systems. Excess energy from the microgeneration
system is used to heat water or rooms rather than exporting it to the grid.
Grid current sensors simply clip around the incoming cables. These sensors
are used to monitor excess power so eddi+ can automatically adjust the
voltage to connected heater. eddi+ can effectively balance excess power
across all three phases.
eddi+ utilises myenergi’s proprietary varisine technology to ensure
compliance with worldwide power grid standards.
Box Contents
eddi+ with mounting bracket
x1
Current transformer with 5m cable (Grid CT sensor )
x3
PT1000 temperature sensor
x1
Minimum Clearances
Connections
150mm
150mm
20mm 20mm
1
2
2
NNL1 L1 L2
L3 H3
H2
H1 N
NO-C-NC
RLY 1
NO-C-NC
RLY 2
eSENSE
+PT1- +PT2-
PT1000
+CT1- +CT2- +CT3-
CTs
ETHERNET
SUPPLY 230/400V
LOAD
24-230V
AC/DC IN
24V OUT
03/16