1. Turn the circuit power and the light switch o before you start.
2. To open the Main Controller Panel (A)
A. Pull the clear tape on the panel.
B. Insert a flat head screwdriver into one of the small notches along the seam. Slightly twist the screwdriver.
Step 1: Mount the Main Controller Panel
• Before you start, turn o the power of your main circuit.
• Plan out your layout. Align and mark the panels of your desired layout on the ceiling.
Nanoleaf Skylight
|
Page 3
1
2
B. Insert & Twist
A. Pull Tape
OFF OFFOFF
A