EasyManua.ls Logo

Nanoleaf Skylight - Page 9

Nanoleaf Skylight
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Nanoleaf Skylight
|
Page 8
Step 1: Mount the Main Controller Panel (cont.)
1. Now align and mount the Main Controller Panel (A) back to the Ceiling Plate.
2. Make sure the wires have passed through the Ceiling Plate and that the Main Controller Panel (A) sits secure and
flat on the plate.
3. Secure the Ceiling Plate with the Wing Nuts (C).
9
C
C
A

Related product manuals