EasyManua.ls Logo

Narada 12NDT26 - Maintenance Procedures and Precautions; Regulated Maintenance; Precautions

Narada 12NDT26
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation manual for Acme series V4.2
- 23 -
Chapter four Maintenance
1. Regulated Maintenance
1.1 Instruments and tools needed:
1.1.1 Digital Voltage Meter
1.1.2 Insulated wrench
1.1.3 Internal resistance, conductive, instant loading experiment instruments
1.2 Monthly Maintenance
Keep the battery-room clean.
Measure and record the ambient temperature of the battery-room.
Check each battery’s cleanness; check damage and overheating trace of the
terminal, container and lid.
Measure and record the total voltage and floating current of the battery
system.
1.3 Quarterly Maintenance
Repeat monthly inspection.
Measure and record floating voltage of every on-line battery. If more than one
battery’s voltage is lower than 13.1V after temperature adjustment, the
batteries need to be equalization charged. If the problem still exists after
adopting above-mentioned measures, the batteries need yearly maintenance or
even three years’ maintenance. If all methods are ineffective, please contact
us.
1.4 Yearly Maintenance
Repeat quarterly maintenance and inspection.
Check whether connectors are loose or not every year.
Make a discharge test to check with exact load every year, discharge 30-40%
of rated capacity.
1.5 Three-year Maintenance
Make a capacity test every three years and every year after six years’
operation. If the capacity of the battery decreases to lower than 80% of rated
capacity, the battery should be replaced.
2. Precautions
2.1 Insufficient Charge

Related product manuals