EasyManua.ls Logo

NARDA RadMan - Switching on ESM Radman

NARDA RadMan
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Operation
and use
Automatic switch on routine
The switch on routine has four main steps.
The end of each step and the beginning of the
next is signaled by a “beep”.
Step 1:
LED check
Step 2:
Battery charge state check
Step 3:
Function check of H-field sensor
Step 4:
Function check of E-field sensor
Tip: The field sensors are activated
separately in step 3 and 4, so they can
be independently tested.
A test generator can be used to
perform and extended function check
of the H- and E-field sensors. (see
page 37).
Switching on
Set the yellow on / off switch to the “ON”
position.
Switching on ESM “RadMan”
Downloaded from Arrow.com.

Related product manuals