EasyManua.ls Logo

NetApp AFF A250 - Page 89

NetApp AFF A250
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the impaired node is
displaying…
Then…
Waiting for giveback…
Press Ctrl-C, and then respond y when prompted.
System prompt or password
prompt (enter system password)
Take over or halt the impaired node:
For an HA pair, take over the impaired node from the healthy
node:
storage failover takeover -ofnode
impaired_node_name
When the impaired node shows Waiting for giveback…, press
Ctrl-C, and then respond
y.
Step 2: Remove the controller module
You must remove the controller module from the chassis when you replace a component
inside the controller module.
Make sure that you label the cables so that you know where they came from.
1. If you are not already grounded, properly ground yourself.
2. Unplug the controller module power supplies from the source.
3. Release the power cable retainers, and then unplug the cables from the power supplies.
4. Insert your forefinger into the latching mechanism on either side of the controller module, press the lever
with your thumb, and gently pull the controller a few inches out of the chassis.
If you have difficulty removing the controller module, place your index fingers through the
finger holes from the inside (by crossing your arms)
Lever
87

Related product manuals