EasyManua.ls Logo

NetApp AFF A300 - Move and replace hardware - AFF A300

NetApp AFF A300
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the healing is vetoed, you have the option of reissuing the metrocluster heal command with the
-override-vetoes parameter. If you use this optional parameter, the system overrides any soft vetoes that
prevent the healing operation.
7.
Verify that the heal operation is complete by using the
metrocluster operation show command on
the destination cluster:
mcc1A::> metrocluster operation show
Ê Operation: heal-root-aggregates
Ê State: successful
ÊStart Time: 7/29/2016 20:54:41
Ê End Time: 7/29/2016 20:54:42
Ê Errors: -
8. On the impaired controller module, disconnect the power supplies.
Move and replace hardware - AFF A300
Move the power supplies, fans, and controller modules from the impaired chassis to the
new chassis, and swap out the impaired chassis from the equipment rack or system
cabinet with the new chassis of the same model as the impaired chassis.
Step 1: Move a power supply
Moving out a power supply when replacing a chassis involves turning off, disconnecting, and removing the
power supply from the old chassis and installing and connecting it on the replacement chassis.
1. If you are not already grounded, properly ground yourself.
2. Turn off the power supply and disconnect the power cables:
a. Turn off the power switch on the power supply.
b. Open the power cable retainer, and then unplug the power cable from the power supply.
c. Unplug the power cable from the power source.
3. Press down the release latch on the power supply cam handle, and then lower the cam handle to the fully
open position to release the power supply from the mid plane.
29

Other manuals for NetApp AFF A300

Related product manuals