a. Cable controller A to IOM A.
b. Cable controller B to IOM B.
2. Power the drive shelves.
You need the following cables:
Power cables
Confirm the drive shelf power switches are off.
a. Connect the two power cables for each shelf to different power distribution units (PDUs) in the cabinet
or rack.
b. If you have drive shelves, turn on their two power switches first. Wait 2 minutes before applying power
to the controller shelf.
c. Turn on the two power switches on the controller shelf.
d. Check the LEDs and seven-segment display on each controller.
During boot, the seven-segment display shows the repeating sequence of OS, Sd, blank to indicate the
controller is performing start-of-day processing. After the controller has booted up, the shelf ID is
displayed.
8

Other manuals for NetApp E Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NetApp E Series and is the answer not in the manual?

NetApp E Series Specifications

General IconGeneral
Form Factor2U, 4U
Drive TypesSSD
Host InterfaceSAS, iSCSI, FC, IB
RAID LevelsRAID 0, 1, 5, 6, 10
Operating System CompatibilityWindows, Linux, VMware
Management SoftwareSANtricity

Related product manuals