EasyManua.ls Logo

NetApp E Series - Page 36

NetApp E Series
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Possible equipment damageIf you replace a fan canister with the power turned on, you
must complete the replacement procedure within 30 minutes to prevent the possibility of
overheating the equipment.
Requirements for replacing a fan canister
If you plan to replace a fan canister, keep the following requirements in mind.
You have a replacement fan canister (fan) that is supported for your controller shelf or drive shelf model.
You have one fan canister that is installed and running.
You have an ESD wristband, or you have taken other antistatic precautions.
If you perform this procedure with the power turned on, you must complete it within 30 minutes to prevent
the possibility of overheating the equipment.
You can replace a fan canister while your storage array is powered on and performing host I/O operations,
as long as the following conditions are true:
The second fan canister in the shelf has an Optimal status.
The OK to remove field in the Details area of the Recovery Guru in SANtricity System Manager
displays Yes, indicating that it is safe to remove this component.
If the second fan canister in the shelf does not have Optimal status or if the Recovery
Guru indicates that it is not OK to remove the fan canister, contact technical support.
Replace E5700 power supply (24-drive)
You can replace a power supply in an E5700 array with a 24-drive shelf, which include
the following shelf types:
E5724 controller shelf
DE224C drive shelf
About this task
34

Other manuals for NetApp E Series

Related product manuals