To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4.
Verify that the package contains the following items:
ItemNumber
Model GS716TP or model GS716TPP switch.
AC power cable (varies by region).
Screws for rack-mounting:
•
Eight small screws to attach the brackets to the switch (four small screws for each side).
•
Four large screws to attach the brackets to the rack (two screws for each side).
Two brackets for rack-mounting.
Installation guide.
Rubber protection caps, which are already installed in the SFP sockets. If you install an SFP
transceiver module, you must remove the cap from the SFP socket.
Rubber feet for desktop or table installation.
5.
If any item is missing or damaged, contact your local NETGEAR reseller for
replacement.
Hardware Installation Guide26Installation
16-Port Gigabit (Hi-Power) PoE+ Ethernet Smart Managed Pro Switch with 2 SFP Ports