EasyManua.ls Logo

Newgen 345-E - Page 9

Newgen 345-E
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Now release the handlebars from the protective packaging and place them on the
stem. Loosely screw the bolts and plate back onto the stem making them nger-tight.
4. Working in a diagonal sequence, tighten each bolt by a half turn before moving
onto the next, allowing each bolt to be tightened evenly until all are tight and the
handlebar will not rotate in the stem. Ensure the handlebars are angled
perpendicular to the ground, as shown in the diagram on p.7.
5. To avoid damage during shipping the pedals are not pre-installed onto the
crank arms. Grab the pedals and the 15mm spanner from the box.
HANDLEBAR AND PEDAL ASSEMBLY
1. First take out the 6mm Allen key (an L-shaped metal tool). You will need this
to install the handlebars onto the handlebar stem.
2. Using the 6mm Allen key, remove all four bolts and plate from the stem.
09
345

Related product manuals