Preparations
Check the miniature circuit-breaker (FC1) in the main
product. It may have tripped during transportation.
Check that the air filters are clean, they can become
dirty after installation.
Filling
Check that there is water in the water seal, fill if ne-
cessary.
Start-up and
inspection
SETTING THE VENTILATION
The ventilation must be set according to applicable
standards. Adjust the supply air flow to guarantee a
negative pressure.
The settings are made in menu 7.1.4.
Even if ventilation is roughly set at installation it is im-
portant that a ventilation adjustment is ordered and
permitted.
Caution
An incorrectly set ventilation flow can damage
the house and may also increase energy con-
sumption.
NOTE
Order a ventilation adjustment to complete the
setting.
Ventilation capacity
0
0 10 20 30 40 50 60 70 80 90 100 110 120
100
200
300
400
500
600
Tillgängligt tryck
(Pa)
Flöde
(l/s)
30%
100%
80%
60%
40%
50%
70%
90%
Available pressure
Airflow
Fan rating
1
0
100 20 30 40 50 60 70 80 90 100 110 120 130
10
20
30
40
50
60
70
80
90
Effekt
(W)
Flöde
(l/s)
30%
100%
80%
60%
50%
90%
70%
40%
Output
Airflow
1
The diagram shows the power consumption per fan.
17Chapter 6 | Commissioning and adjustingNIBE ERS S10-400
S
Commissioning and adjusting

Table of Contents

Other manuals for Nibe ERS S10-400