Cable routing
The following image shows recommended cable rout-
ing from the distribution box to the condensation water
trough on the inside of F2120. Transition between the
electrical cable and the heating cable must occur after
the lead-in to the condensation water trough. The
distance between the distribution box and the lead-in
to the condensation water trough is approx. 1,600 mm.
LEK
LE
K
Data
Serie.nr.
Art.nr.
711453
OUT
IN
LE
K
Data
Serie.nr.
Art.nr.
711453
OUT
IN
NIBE™ F2120Chapter 5 | Electrical connections28