EasyManua.ls Logo

Nibe F370 - Page 25

Nibe F370
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Filling the climate system
If the pressure is too low, increase as follows:
1.
Check if the flexi hose supplied is connected between the two filler
valves. Adjust the hose if this has not been done.
2.
Open the filler valves. The boiler unit and the rest of the climate system
are filled with water.
3.
After a while the pressure rises on the pressure gauge. When it is ap-
prox. 1.0 bar close the filler valves.
LEK
LEK
LEK
/
A
PH
LEK
PBD sv
LEK
LEK
BP5
QM20
GP1XL3FL2FL1CM1
QM31XL1XL4XL2 QM32WM1
QN11 MA1QM11 FL6
EB1
FA1
AA1
FD1
PF3
PF1
AA3
AA2
UB1
UB2
AA4
SF1
W130
UR1
GQ10EB1 GQ2
EB10QN1 CA1 HZ1
XL32 XL31
QM10
WM2
L
E
K
LEK
LEK
LEK
/
A
PH
LEK
PBD sv
LEK
LEK
BP5
QM20
GP1XL3FL2FL1CM1
QM31XL1XL4XL2 QM32WM1
QN11 MA1QM11 FL6
EB1
FA1
AA1
FD1
PF3
PF1
AA3
AA2
UB1
UB2
AA4
SF1
W130
UR1
GQ10EB1 GQ2
EB10QN1 CA1 HZ1
XL32 XL31
QM10
WM2
Venting the climate system
In event of repeated filling of the climate system or if bubbling sounds are
heard from the heat pump the system may need venting. This is carried
out as follows:
1.
Turn off the power supply to the heat pump.
2.
Vent the heat pump via the vent valve and the rest of the climate sys-
tem via the relevant vent valves.
NOTE
The vent pipe from the container must be drained of water before air
can be released. This means that the system is not necessarily bled despite
the flow of water when the bleed valve is opened.
Therefore hold the vent valve open for at least 5 seconds.
23NIBE™ F370Chapter 2 | The heat pump the heart of the house

Other manuals for Nibe F370

Related product manuals