EasyManua.ls Logo

Nibe HBS 05 - Delivery and Handling; Transport; Assembly

Nibe HBS 05
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport
VVM 320 should be transported and stored vertically in
a dry place. However, the VVM 320 may be carefully
laid on its back when being moved into a building.
R
0
R
0
R
0
R
0
Assembly
Position VVM 320 on a firm base that can take the
weight. Use the product's adjustable feet to obtain a
horizontal and stable set-up.
Position VVM 320 on a fixed foundation that can take
the weight of the heat pump. Use the product's ad-
justable feet to obtain a horizontal and stable set-up.
30 - 50 mm
30 - 50 mm
15 - 40 mm
20-55 mm
Because water can emerge from the safety valve for
hot water in VVM 320, the area where VVM 320 is
located must be provided with floor drainage.
INSTALLATION AREA
Leave a free space of 800 mm in front of the product.
All service on VVM 320 can be carried out from the front.
NOTE
Leave 10 25 mm free space between the in-
door module and the wall behind for routing of
cables and pipes.
NIBE VVM 320Chapter 2 | Delivery and handling8
2 Delivery and handling
All manuals and user guides at all-guides.com

Related product manuals