Provides crucial safety instructions for installation, use, and potential hazards.
Requirements and procedures for inspecting the heating installation before commissioning.
A comprehensive checklist of checks to perform before commissioning the system.
Instructions and specifications for connecting refrigerant pipes to the unit.
Specifics on making refrigerant pipe connections, including flare type.
Procedure for pressure testing and leak detection of the installed pipe system.
Instructions for using a vacuum pump to evacuate air from the system.
General safety and installation rules for electrical connections to the unit.
Instructions for establishing communication between HBS 05 and AMS 10.
Instructions for establishing communication between HBS 05 and VVM.
Instructions for establishing communication between HBS 05 and SMO.
Essential steps to take before starting the commissioning process.
Guide for starting the system and performing initial operational inspections.
Requirements and documentation for inspecting the completed installation.
General advice and steps for diagnosing and resolving comfort-related issues.
Diagnosing and resolving problems related to insufficient hot water supply.
Diagnosing and resolving problems causing low room temperatures.
Descriptions and potential causes for sensor faults BT3, BT12, and BT15.
Alarms indicating high temperature out of or into the condenser.
Alarms triggered by high pressure switch activation or low pressure sensor readings.