Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
DateSignatureNotesDescription
Heating medium (page 15)
System flushed
System vented
Particle filter
Shut-off and drain valve
Charge flow set
Electricity (page 22)
Fuses property
Safety breaker
Earth circuit-breaker
Heating cable type/effect
Fuse size, heating cable (F3)
Communication cable connected
AMS 10 addressed (only when cascade
connection)
When installing AMS 10-6 / HBS 05-6,
check that the software version of the in-
door module/control module is at least
v8320.
Miscellaneous
Condensation water pipe
Caution
HBS 05-6 only compatible with AMS 10-6
HBS 05-12 only compatible with AMS 10-8 / AMS 10-12.
HBS 05-16 only compatible with AMS 10-16.
7Chapter 1 | Important informationHBS 05