EasyManua.ls Logo

Nibe HBS 05 Series - Installation Inspection and Checklist; Inspection of the Installation

Nibe HBS 05 Series
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
DateSignatureNotesDescription
Heating medium (page 15)
System flushed
System vented
Particle filter
Shut-off and drain valve
Charge flow set
Electricity (page 22)
Fuses property
Safety breaker
Earth circuit-breaker
Heating cable type/effect
Fuse size, heating cable (F3)
Communication cable connected
AMS 10 addressed (only when cascade
connection)
When installing AMS 10-6 / HBS 05-6,
check that the software version of the in-
door module/control module is at least
v8320.
Miscellaneous
Condensation water pipe
Caution
HBS 05-6 only compatible with AMS 10-6
HBS 05-12 only compatible with AMS 10-8 / AMS 10-12.
HBS 05-16 only compatible with AMS 10-16.
7Chapter 1 | Important informationHBS 05

Related product manuals