General
Pipe installation must be carried out in accordance with
current norms and directives.
AMS 10 and HBS 05 work up to a return temperature of
approx. 55°C and an outgoing temperature from the
heat pump of approx. 58 °C.
HBS 05 is not equipped with shut off valves on the water
side, these must be installed to facilitate any future ser-
vicing.
When docking with HBS 05 free flow in the climate sys-
tem is recommended for correct heat transfer. This can
be achieved by use of a bypass valve. If free flow cannot
be ensured, it is recommended that a buffer tank (NIBE
UKV) is installed.
15Chapter 4 | Pipe connectionsHBS 05
4 Pipe connections