To Installers
PELLUX 100/20, PELLUX 100/30
17
Electrical Connecons
Electrical Connecons
Connecon
Internal Overvoltage Protecon
Control Panel Connecon
L
H
GND
+12V
GND
CAN
+12V
see Boiler Regulator Sengs
Only an appropriately authorized and qualied elec-
trician may connect the electrical installaon and per-
form its servicing. The electrical installaon and cable
roung must be done in accordance with applicable
regulaons.
ATTENTION
No other electrical equipment may be connected to
the boiler power supply line.
ATTENTION
Power supply of the heang system must be discon-
nected when connecng the control panel.
ATTENTION
Connecon may only be performed with power sup-
ply disconnected and only by an individual appropria-
tely authorized to do it.
ATTENTION
Always remember to install the terminaon at the
end of each CAN communicaon path. This is required
even when connecng a single communicaon
module.
ATTENTION