INSPECTION OF THE INSTALLATION
In addition, fill in the page for the installation data in the User Manual.
Current regulations require the supply air module to be inspected before it is put into service. The inspection must
be carried out by a suitably qualified person.
DateSigna-
ture
NotesDescription
Ventilation (page 13)
Setting ventilation flow exhaust air
Setting ventilation flow supply air
Heating medium (page 12)
System flushed
Accessories bled
Check against output and pressure
drop diagrams
Connected according to outline dia-
gram
Electricity (page 15)
Supply connected 230 V
Connected communication
SAM 42Chapter 1 | Important information6