EasyManua.ls Logo

Nibe SAM S42 - Installation Inspection

Nibe SAM S42
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSPECTION OF THE INSTALLATION
In addition, fill in the page for the installation data in the User Manual.
Current regulations require the supply air module to be inspected before it is put into service. The inspection must be
carried out by a suitably qualified person.
DateSignatureNotesDescription
āœ”
Ventilation (page 16)
Setting ventilation flow supply air
Heating medium (page 13)
System flushed
System vented
Check against output and pressure drop dia-
grams
Connected according to outline diagram
Electricity (page 17)
Supply connected 230 V
Connected communication
SAM S42Chapter 1 | Important information6