EasyManua.ls Logo

Nibe SPLIT - Page 22

Nibe SPLIT
40 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LEK
HQ1
QM31
5
Carefully open the closed valves.
Look for any water leakage.
5.
LEK
FL2BP5
Check the system pressure on the
manometer (BP5). Top up the sys-
tem with water if necessary.
The climate system's safety valve
(FL2) must be completely sealed.
6.
L
EK
QM20
QM24
QM60
Vent the system via the vent valves
QM20), (QM24) and (QM60.
7.
AA21
Remove the old CPU board (AA21)
and install the new one.
Take care with the connections on
the board.
8.
| GB22

Related product manuals