EasyManua.ls Logo

Nibe VVM 500 - 2 Delivery and Handling; Transport; Assembly

Nibe VVM 500
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport
VVM 500 should be transported and stored vertically in
a dry place. However, the VVM 500 may be carefully
laid on its back when being moved into a building.
R
0
R
0
Assembly
Place VVM 500 on a solid foundation indoors that can
take its weight. Use the product's adjustable feet to
obtain a horizontal and stable set-up.
The space where VVM 500 is located must be frost-
free.
30 - 50 mm
30 - 50 mm
15 - 40 mm
20-55 mm
Because water can exit the safety valve
1
for hot wa-
ter, when connected to VVM 500, the space where
VVM 500 is placed must be provided with a floor drain.
1
Not enclosed.
INSTALLATION AREA
Leave a free space of 800 mm in front of the product.
All service on VVM 500 can be carried out from the front.
800
10-25
50
50
NOTE
Leave 10 25 mm free space between
VVM 500 and the wall behind for routing cables
and pipes.
NIBE VVM 500Chapter 2 | Delivery and handling8
2 Delivery and handling

Other manuals for Nibe VVM 500

Related product manuals