Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
In addition, fill in the page for the installation data in the User Manual.
DateSigna-
ture
NotesDescription
Heating medium, see section "System
diagram"
System flushed
System vented
Expansion vessel
Particle filter
Safety valve
Shut off valves
Boiler pressure
Connected according to outline dia-
gram
Hot water, see section "Cold and hot wa-
ter"
Shut off valves
Mixing valve
Safety valve
Electricity, see section "Electrical connec-
tions"
Connected communication
Circuit fuses
Fuses, indoor module
Fuses property
Outside sensor
Room sensor
Current sensor
Safety breaker
Earth circuit-breaker
Setting of emergency mode thermo-
stat
Miscellaneous
Docked to
NIBE VVM 500Chapter 1 | Important information6